eprbulletsafsc.com

Helicopter/ Tiltrotor Aircraft Maintenance

- Answered HHQ tasking; prep'd/folded/up-loaded 3x HH-60s/4 pallets--postured Hurricane Michael spt pkg <19 hrs
- Augmented propulsion shop; performed 97 eng hot washes/mitigated sys degradation--svd 14 engs/$98M/315 man-hrs

- Broadened technical skills; asst'd propulsion section w/100+ eng rinses/comp washes--maintained $1.4M AF assets

- Chosen for Ex TIGER RESCUE TDY; gen'd 3 acft/27 sorties/75 flt hrs/97% MC rt--vital to 24 aircrew NWOP quals

- Directed M/R flt ctrl rig tm; trn'd 3-mbr/smashed std by 6 hrs/aced KTLs---cemented HMU's 94% QA pass rt FY18
- Directed transmission leak mx team; isolated TGB lk/replaced input seal--preserved $70K component/aced KTL insp
- Discovered auxiliary fuel tank leak; reseated fuel vent line/R2 crushed packing--enabled AR/formation trng f/2 crews
- Discovered worn tail rotor paddles--trn'd 4 Amn on replacement/balance procedures--all mbrs cert'd/incrs'd quals 10%

- Expedited 539 sorties to meet 1.8K FHP; supervised 13K mx actions--maintained 82% MC rate/beat ACC std by 8%

- Facilitated CBRNE trng; taught MOPP lvls, PAR sweeps/equip protection to 150 prsnl--incr'd chem attack readiness
- FCC program manager; performed 25 FCFs/accrued 40 flt hrs--key to units successful 1.9K FHP/gp best 86% FSE rt

- Guaranteed HH-60W structural integrity; implemented AFTO 22's f/add'l NDI insps--established bedrock f/fleet hlth
- Guided multiple orgs f/major acft structural repair; removed MR drive sys/integral fuel tanks--solidified 89% AA rt

- Harmonized phase workcards w/TCTO; integrated/repaired 27 add'l mx discreps--enabled 41 HMU 100% MSE 3Q21

- ID'd worn center stabilator; trn'd 5 prsnl on bushing replacement--incrs'd quals 14%/returned $45K asset to inventory
- Identified fuel tank leak; coordinated fuel line/packing R2--enabled crew night water op trng/held zero% repeat rt 2Q
- Implemented HH-60W insp relocation; led mvmts f/$1.2M assets/24 mbrs--spt'd $860K CRH fac refurb/13 HH-60Ws
- Instructed four phases; synced 11 AFSCs/4.4K mx actions/8 TARs/39 KTLs--concluded HH-60G phase insps f/23 Wg
- Investigated vibe anomaly; analyzed IVHMS data/balanced drive-shaft--negated $700K eng swap/WRE lvl depletion

- Lead ADCC; comp'd 1.2 mx tasks/closed 1.4K FHP/155 PRDs--crucial to 92% 12-hr fix rt, FY18/23 MXG fleet best
- Led 11 tng day events; 6 Amn/156 tasks/four certs--maintained 100% trng currency/pushed four 5 lvl/one 7 lvl upgrades
- Led main rotor rig; trnd 5 Amn/guided flt control/cable adjustments/aced QA KTL eval--awd'd unit's MPoQ 3Q
- Led mx efforts Gila Bend exer; gen'd 14 sorties/67 flt hrs--enabled 216 RAP events f/22 aircrew/incrs'd CMR rt 6%

- Mentored Amn; ID'd trng shortage f/4 amn on TH/PR/50-hr/150-hr insp--instr'd trng day crs/qual'd on 48 TBA tasks
- Mobilized acft f/HURREVAC; folded/loaded 3 HH60 <9 hrs/12 hr std/on site <19 hrs--provided PR efforts f/37K civs

- Orchestrated HH-60W transition; standardized phase insp--pioneered phase procedure f/113 acft AF wide worth $5.2B
- Oversaw 5x 50/2x 150/1x 300-hr insps; ID'd/resolved 12 major discrepancies--vital to units flawless 100% MSE rt
- Oversaw deployment reconstitution; unfolded/reconfigured 3x HH-60s--acft FMC <3 days/10 day std/incrs'd AA 38%
- Oversaw IVHMS anomaly; coord'd extensive TS/repair w/engineer schematics--IVHMS operational/acft return FMC

- Performed 1.4K mx tasks; completed 240 pre-flt insps/resolved 74 PRDs--closed 1.9K FHP/upheld gp best 84% MC rt
- Performed outside primary AFSC; CUT on 12 avionics tasks/performed sys op cks--secured units 92% MC rt Q4 FY18
- Pin-pointed damaged input module mount stud; replaced module/gimble <12 hrs--secured units 94% 12 hr fix rt May
- Pinpointed MRH torque stabilization issue; discovered thrust washer warped--saved 12 hrs in additional maint man hr

- Qual'd Eng/Hydro prsnl on APG tasks; cert'd 10 mbrs on 75 CUT mx actions--unified 3 AFSCs/exploited tm concept

- Remedied flt cntrl malfunction; pinpointed/replaced ratcheting swashplate bearings--cemented 0% repeat/recur rt 3Q
- Remedied transmission chip light air abort; isolated/replaced damaged IGB <3 hrs--enabled 89% 12-hr fix rt Mar 18
- Remedied weak MLG brake PRD; trn'd 5 mbrs on component overhaul/bleed procedures--incrs'd section's quals 13%
- Replaced worn probe bushings; changed in 5 hrs/negated $175K assy swap--reduced oscillations/acft structural wear
- Resolved fuel leak Redball; replaced AR probe nozzle <30 min/1 hr std--bolster units outstanding 98% FSE rt Jul 18
- Resolved probe oscillation PRD; replaced 4 worn bushings--reduced acft structural fatigue/negated $175K assy swap
- Responded to high freq vibe; ID'd wrongly shimmed driveshaft/trn'd 4 mbrs on proper procedures--incrs'd quals 35%
- Responded to TLG Redball; isolated/replaced bent tail wheel lockpin--abated grnd abort/aided 4K+ FMC hrs Mar 18

- Supervised 13K mx tasks/539 msns; drove gp best 82% MC rt/beat ACC std 8%--pwr'd 1.8K FHP/3.6K RAP quals
- Supervised multi acft recon tm; unfolded 3x post deployment acft/trn'd 4 Amn--incr'd AA 38%/2 AFSCs 100% qual'd
- Supervised safety critical tail servo TCTO; qual'd 3 prsnl on servo R2 procedures--completed TCTO 48-hrs/30 day std

- T/S MRH torque stabilization issue; pinpointed/replaced warped thrust washer--alleviated multi-day heavy mx action
- Troubleshot flt ctrl malfunction; R2 yaw servo/rigged MRH/TR 12 hrs--acft FMC 2nd flt/enabled 93.7% MC rt 4Q18
- Troubleshot hydro pump Redball; ID'd/replaced defective pressure sensor <30 min--enabled nt formation trn f/6 crew

- Upheld strict mx standards; 2 PEs/5 QVIs/zero defects noted--vital to unit's 94% pass rt/awarded QA Honor Roll 2Q

- Worked outside of AFSC; aided ECM/ID'd cracked IRCM xmitter--upheld EW capes/solidified 100% ATO coverage


Bullet statements may be contributed using this form. Thanks!