- Aided complex intra-AOR equip transfer; reutiliz'd $60K ECUs--protected $1.8M sys/$598K ntwk equip iso 40 strikes
- Crafted $300K lodging HVAC project; captured night shift needs/ensured QoL--assured 24/7 msn operability
- Created CE multi-craft PM validation database; found >330 assets for 67 critical fac's--increased eqpmt lifespan 80%
- Created database/tracked ventilation equipment in two hundered facilities--improved air quality/production
- Created/instructed wkly Airmen's Manual trng; briefed psnl on emergency mgmt skills--ensured 90 psnl ATSO
- Direct'd recurring work prgm/400hrs; increased equipment performance reliability--reduc'd service calls 65%
- Directed freezer upgrade; led 3 prnl/installed 4 freezer doors--averted $10K food loss, maintained svc f/1.2K patrons
- Directed HVAC WO requests; drove 24 in-house proj's--saved $400K vs contract costs/fortified mililtary OJT
- Dply'd 365 days across 3 sites; mx'd 27 HVAC sys/14 pwr plants--sustained 1M sq mi battlespace/$2.5M gnd spt fleet
- Drove craft f/$1.2M RQS proj; exec'd 200 ft gas/electric/50T AC sys install--sec'd $11M CSAR med eqpmt/53 msns/yr
- Earned 6 cr hrs towards BA; host nation beautification proj leader; AF10K/Race for Cure 5K; s-ball team mbr
- Engineered 86 CS cooling tower proj; sourc'd rpr contract--solution svd $200K vs replacement/zero comm downtime
- Engr'd $500K mech sys; org'd 3 mbrs/designed/est'd 11 ACs/pneumatic sys/700 ft duct--propelled $137K TTP f/65 prsnl
- Fill'd Mech Eng pos 8 mos; direct'd review of >40 fac's/elim'd 1K contract defects--on-target to garner AF lvl funding
- Guided 3 Amn; restor'd five problem units at wg auditorium--achiev'd optimum climate for CC/wing functions
- Headed HVAC reno; enhanced 11 sys's nixed 16 faults f/$6M IRS infra--sustained 2.7K jt prsnl, backed $490M msn
- ID'd RAB's oldest a/c sys's for replacement; processed 16 WOs--reduced ops costs by $250K/steer'd CE's #1 priority
- Install'd 12 A/C units for F-15 hangars; ensur'd timely mx of $358M assets--key to success/1.4K theater sorties
- Lead HVAC AMP; drove weekly mx plan/sustained $18.5M eqpmt/reduced failure 65%--guarded $281M infrastructure
- Led 3-mbr emergency tm; calibrated ventilation syst/chiller ctrls--spt'd 2 wg events & sustained $4M in HVAC assets
- Led install of 1.5 ton cooling unit; prevented AFN eqpmt over heating--ensured radio & tv forecast f/10K mbrs
- Led USAFE's lrgst R&M IPL prgm; RAB prim'd for success in FY16 w/$18.1M/45 sustainment proj's
- Liaison for UAV build-up study; analyzed >100 ft piping/30 units--strength'd USAFE/AFRICOM/CENTCOM msn's
- Managed $50K USCBP proj; synced 3 AFS's, installed 2 a/c sys's--safeguarded $2M intel equip ISO $43B ISR yrly
- Managed 10 yr infra prgm FY16/17 IPlan; validated 22 projs/125 wk rqmt's--postured >$20M future execution
- Mng'd R&O Mech AMP; drove mx 1.1K HVAC sys's/preserved $1B eqpmt/reduced failure 65%--$10.2B fac's intact
- Overhauled Warfare Center humidity syst; replaced 30 UV lamps--protected $30M in assets, saved $15K in ktr costs
- Oversaw ISR site upgrade; replaced $60K server a/c, trn'd 5 mil--stabilized jt CN ops in $1.2B glbl drug seizures yrly
- Oversaw MXS fuel syst rpr; secured 60-ft purge duct--zero msn loss & guaranteed mnx of 29 F-16s valued at $765M
- Oversaw operating room upgrade; surveyed/initiated HVAC support--boosted surgery capabilities 25% - 75%
- Recommended use of user-friendly thermostats and filter replacement media--modernized without expense
- Recon'd 2 radar ECUs; t/s faulty control board/dmg'd fan motor--restored $117K eqpt assets/site HVAC eqpt flt FMC
- Repair'd A/C unit for internet transfer node; restor'd equip cooling--saved $1M network/enabl'd real-time ISR
- Repaired faulty cooling sys; t/s & replaced dmg'd elec contactors/sensing bulb--returned ops cape of $25K HVAC unit
- Repaired PMEL humidity system; restor'd critical tolerance FMC<24 hrs--protected $30M+ acft avionics T&E assets
- Restored Alt CP A/C; led 3 prsnl/installed 2-ton unit--saved $10K in comm servers & equip/sustained wg's 24/7 msn
- Reviewed 32 construct designs/11 SOWs; provided 27 HVAC inputs--ensured proj's met stringent Fed/German reg's
- Revived UAV server cooling; trained 2 Amn/rpr'd cntrl switch on $160K sys--backed 32K flt hrs yrly ISO 6 CCMDs
- Spearheaded temp a/c replacement at 3189; installed new unit/upgraded breaker--protected $8M emer UPS sys
- Spt'd Army Patriot site/maint'd 25 units; protected $35M SAM asset/150 psnl--promoted base defense function
- Spt'd shop stock inventory; cataloged 1.1K pwr plant/HVAC parts--validated $84K rpr parts/spt'd $1.4M gnd spt eqpt
- Steered KMC eqpmt inventory capture; led 52 techs/4 AFSCs/1.3K fac's--completed 3 yrs ahead of AFCEC deadline
- Stood up AF level asset condition prgm; evaluated >$20M in proj's--bolstered crit data support for FY16 IPL defense
- Supervised 7 troops; executed 1.5K jobs/achieved 98% same day svc rate--maintain'd 3.5K HVAC sys/$4.5M
- Supervised repair of air conditioning at Air Force Network facility; protected $2.5M in critical equipment
- Supported NexGenIT start; tm'd w/AFCEC reps/utilized PMTL stds--dvlp'd shop labor & mx tracker/fixed 152 defects
- Trained 4 Amn; managed A/C upgrade, restored climate control--safeguard'd network control ctr's $9M server
- Troubleshot gen pallet fault; id'd & replaced $500 alternator assy--restored $86K asset/safeguarded radar data link msn
- Upgraded sq Engineering Flt HVAC sys; led 3/installed $5K units--moderniz'd climate ctrl/spt'd planning f/$9.8M TTPs
- Vital to heat plant upgrade; trenched 12 meters, replaced 3-ft of damaged pipe--prevented 3K gals of water loss daily