Duty Description
- Manages 18 mil/civ psnl; maintains 2 10K ft runways/14M SF afld pavement/drainage sys's for AF's lrgst FW
- Sustains 5K+ base populace; mx 17M sq ft airfield pavements/1K facilities/spt's 24 sqs/137 F-16s/24K sorties
- Leads preventative mx on $1.4M in heavy tools/eqpt; ensures safety of hvy eqpt ops spt'g 285 plts/$5.5B assets
- Manages shop discipline, evals, training, inventories, physical fitness; oversees heavy eqpt support to 6 GSUs
Performance Assessment
- 1/4 certified locksmiths on island; keyed 16 EMS doors after hrs--cut 24-hr on-guard security/saved $12K bill
- AF Assistance Funds Sq POC; helped identified "fair share" donation per rank--ensured charitable support
- Alt VCO--brief'd weekly vehicle safety info/kept 30 shop personnel safe on/off duty--reduc'd mishap by 80%
- Alternate key person for CFC; contacted 12 personnel/collected $42 towards CFC--ensured continuous support
- Assisted in modernizing dorm; secured roof panels/rebuilt laundry/day room--saved $254K/AETC/CC priority
- Assisted pool renovation; placed 400 ft fence/fabricated pump bracket--provided safe environment/increased security
- Astounding craftsman; overhauled training Site 61; improved U.S. / Israeli Air Defense Capabilities
- Astutely led 2 crews on $75K supply warehouse upgrade; secured $4M of Army assets--earned AAM for
- Attended AF Trainer crs--taught sheetmetal fabrication techniques--helped five Airmen complete 44 task req's
- Attended Base-X shelter class; acquired set-up/teardown training skills--reduced IRF bed down time by 50%
- Attended Professional Development class; gained valuable knowledge--improved managerial/comm skills
- Authored $35k Operation Center renovation project; consolidated office space--increased AOC/COD efficiency
- Bold leader! Actions garnered '12 Wright Awd "Best Ops Flight in AETC" & 56 FW AFOUA--MSgt today!
- Boosted sign shop efficiency 200%; led 2/reno'd 425ft² work space/install'd $65K eqpmt--svd 120 mn hrs/$17K annually
- Built massive 1.4K-sq-ft bio-waste accumulation fac--ensured health/safety for AOR's largest, busiest EMDG
- Built window screens; fabricated/installed 2K ln ft metal framework--saved $43K/met 49th MSG CC priority
- Captained VSC revamp; dev'd org plan f/11K sq ft warehouse--ID'd/secured $4M tools/Sq assets/prep'd f/HVAC TTP
- Catalyst for Youth Center Capital Improvement Proj; spearheaded facility eval--improved QoL for xxx+ prsnl
- CE bivouac convoy commander; organized/led movement of 15 vehicles/118 mi--126 engineers trnd/AOR rdy
- Cited by ALS Commandant as #1/50 graduates; sel’d as John L. Levitow Awd winner--coined by Wg/Gp/Sq CC
- Closer; PM f/RTV DFAC; exped'd $650K HVAC/Fire Sys repair--expedited move/rescued MILCON proj't 7 yr delay
- Comp'd 15 RWP req; evaluat'd/fix'd 5 hangar doors--mitigat'd flt msn stoppages/exten'd equipment service life
- Completed 9 credit hours; enrolled in additional 6 towards Proj Mngt degree--continually expanding knowledge
- Completed annual hands-on CPR training--expanded mission capabilities--gained fundamental life saving skills
- Completed Supervisor Safety Training--broadened hazard knowledge--streamlined workcenter safety process
- Conducted 13 vaults/safe inspections prevented lock out failure/malfunction--svd $34K in equipment damage
- Conducted ann'l ladder inspection; physically examined 10K rungs/bolts/platform--prevented possible failure/injuries
- Constructed SATCOM facility; fab'd/supported $50K+ cooling tower--uninterrupted comms for 181 SOF psnl
- Constructed two 7.2 SF SWA huts; 144 bed spaces enabled COB Basra to support US draw-down in MND-S
- Contributed to section completing 1.3K DSWs/4 projects/$860K val--boosted infrastructure/QoL for 6K+ mbrs
- Converted 1.3K sq ft warehouse--created four offices--increased logistics transportation msn capability 95%
- Coord'd w/62 OSS f/D-ILS re-dplymnt; led 12/const'd 600 ft shelter--shield'd $1.3M crit eqpmt/comp'd msn 4 days AOS
- Craft lead--constructed 3K sq ft maint facility--enabled redeployment of 100 urban terrain Stryker vehicles
- Created mat'l list for reno proj; supplied xx vol's w/ $xxxx mat'l--bettered the living env for fam of fallen amn
- Created processing device--improved wildife/fisheries customer svc capability--reduced carcass waste 92%
- DART team leader; led four engineers in air base recovery ops for Local ORE--critical mission unhindered
- Deployed 161 days to AUAB; provided structural support for SOCCENT msn--sustained Operation OND/OEF
- Deployed to Thumrait AB Oman--renovated 1.3K sq ft floor--eliminated trip hazard for 25 PERSCO personnel
- Designed catwalk repair project; cited faulty concrete defects--reduced safety hazards for 500+ personnel
- Designed FOD inspection sign; produced two mobile a-frame designators--bolstered $6.2B C-17/KC-35 tng mission
- Designed/constructed 200 sq-ft portable latrine--killed-off 3 major MEO write-ups for FD & boosted morale
- Developed AMD HVAC unit installation proj; provides quality inspections --prevented potential equip damage
- Developed/implemented duty section's trng plan--strategy recognized as best practice by wg inspection team
- Directed key plan/led crew of five, installed 60 locks during $750K command post renovation--saved AF $3K
- Drove $15K ECP relocation/proj comp’d in 4 vs 8 wks--kept $74M DoDDS proj on sched/safed 4K pers/day
- Drove pool renovation; paced 350 fence planks/affixed water slides/created handicap stall--saved $20K vs. contract
- Drove wg marquee relocation, guided crane/removed/installed main gate attraction--svd $65K in replacement
- Dynamic NCO! Contributed to unit wining '12 MG Clifton D. Wright Awd "Best Ops Flt in AETC"--promote!
- Emer responder; overcame main ECP security breach/constructed 60 ft gate--safeguarded 6K psnl/$5.5B assets
- Engineered metal door for F-15 fuel pod exam area--quick response eliminated hazardous & restricted enviro
- Ensured classified materials access, cracked three high security containers in 1 hr--svd $2K replacement cost
- Erected two 2.2K sq ft ABM facilities at Eglin AFB; placed 330 cu yds of concrete--secured $10M trng assets
- Established hero parking; created eight purple heart/surviving family member spots--honored fallen hero's & families
- Executed crane lift ops; rigged 288 picks/recisely placed 39K sq ft roof panels--accel'd gp's largest site/$503M MCP
- Exped shelter SME; erected 4 MSSs/11 EMEDs--prov'd 50 bed theatre hosp/incr'd NBG treatment capes f/1156 sailors
- Expertly built $32K high security lock sys <2 days--led to 24/7 Eagle Cash access for 27K coalition warriors
- Fab'd drop-arms at ECP & convoy CP--sealed off insurgent/enemy infiltration; motivated 100+ safe daily msns
- Fabricated 2 TEMPER tent containers; procured $40K BEAR Base equipment--enabled beddown 65 SOF psnl
- Fabricated culvert gate--resolved flightline security violation--safeguarded $600M in aircraft/assets--promote
- Fabricated/installed 256 square ft duct transitions, linked four 25 ton units to bldg--saved $9K contractor costs
- Fortified 718 AMXS HAZ roof integrity; re-sealed 25K sq ft--protected $35M KC-135/vital aircraft eqpt
- Guided $50K refurb/Warrior Prep Ctr; added media ctr/1K sq ft to conf rm--incr’d venue spt/NATO GO conf
- Guided SABC/CBRNE crs; trnd 280 students wkly--strenghtened warrior knowledge/Amn ready to save lives
- Guided section training--forecasted contingency/ancillary trng for 21 members--reduced overdue status 15%
- Hard charger! Aggressively demolished 1700 lf/8-in reinforced concrete sidewalk; prepped bldg for new surface
- Honchoed $200K jt op; coor'd w/Naval Const/rplc'd 4mi fence--estab'd protective threshold f/640 acre afld/8K prsnl
- Hung $45K/64K square ft drywall; added moisture resistant/fire retardant properties--nullified safety write ups
- Identifi'd faulty roof structure; remov'd/replac'd 400 sqft shingles-- prevent'd damage to historical site value'd at 967K
- Identified faulty roof structure; caulked/sealed 100 ft cracks/leaks--prevented damaged to 50K parts valued at $4.1M
- Identified/corrected structural flaws, stood up new $250K AMC terminal--saved $20K over contract estimate
- Innovatively converted wood storage area to new finish carpentry area--avoided potential safety write up
- Installed 12 cipher locks throughout wg, met DoD security standards--ensured zero force protection violations
- Installed 800 lineal ft forms; ensured precision alignment; allowed placement of 48 CM concrete for safe passage
- Installed 9 cipher locks; secured EMS facility/CBRNE shelter sys--preserved 186 psnl/$24M assets--promote!
- Installed eight locks in drug testing facility, safeguarded test results/patient privacy--secured $76K AF assets
- Instructed 40 pers; guided proper tent construction; systematically verified 100% tent account/exceeded CC deadline
- Integrated high security door installation/master key plan for base radar facility--provided $3.5M asset security
- Key BEAR base setup member; led 80 pers/two tent system erection/tear-down--enhanced SQ contingency readiness
- Key craftsman; led two Amn/removal/installation 240 sq ft drywall--prevented C-17 sim damage/training interruption
- Key to shop Recurring Work Prgm; inspected/repaired 1K+ ladder/roof sys--no safety discrepancies/write-ups
- Lead CPR instructor; trained/certified xx prsnl--ascertained AFCEC regulation compliance and Sq proficiency
- Leads by example; installed $160K glass pulverizer; crushed 43K tons/yr--saved AF $750K in recycling costs
- Led $245K multi-craft FMO project; built 4K sq ft foundation--corrected UCI write-up/$1.4M assets secured
- Led 6 pers/$175K fac upgrade; renovated 1.2K sq ft bldg space--spt’d USAFE’s largest thrift store/53K users
- Led 6; certified 9 SSS/prepped deployment pkgs/$90K val--enabled Op NOBLE EAGLE/200+ mbr beddown
- Led contract flight deployment tng; instructed tent system setup/tear-down--broadened contingency capes for 12 pers
- Led crew of three, bore two holes through concrete wall--enabled $100M line-of-sight satellite installation
- Led four Amn--return'd 30 tents to serviceable condition--improved QoL for 405 AEG Quick Reaction Force
- Led four Amn/renovated civilian personnel office, removed/built walls and ceiling--increased work area 50%
- Led route clearance team beddown--built 20 rms/MWR for 55 soldiers--allowed 70-mile IED clear route wkly
- Led team of 4! Quickly replaced 8 security perimeter locks for Red Tails AEW--deadly accuracy guarded 4K
- Led two Amn for theater grand opening; laid 100 tiles/cove base/fabricated drain--enjoyed by 9K base pers/families
- Led xx persnl; forged theatre for wing morale concert--catered to>xx military and civilians/laud'd by base CC
- Liaison f/DPTAMS contingency ops tm; demo'd SSS procedures f/30 prsnl--benchmark'd 80+ tent LSA pln f/1.2k troops
- Made mission success a priority--completed 140 work orders/slashed backlog 20%, promote ahead of peers!
- Managed $364k JTAGS/TMO construction project; provided qlty inspections--enhanced TBM mng't capabilities
- Managed 5-man repair team--redesigned/rebuilt 220 B-Hut footers--safeguarded building collapse and mission
- Managed MSA munitions hoist mx pgm--zero discrepancies--receiv'd "Satisfactory" rating for '11 AFGSC NSI
- Masterfully installed high security locks for hangar/TOC--efforts protected $100M UAV/MNC-Iraq OPLANS
- Mentored 10 Amn on task; built 120 ft rebar cages/cut 250 block--critical skill required for future deployment
- MICT sub-AMP manager; ULSO maintained accountability for xx lasers valued > $xxxx--ensured safety stds
- Mng’d $5K Equal Opportunity proj; partitioned 600 sq ft office/4 days early--enabled privacy/30 patrons daily
- Mng'd 7 multi nat'l prsnl; rpr'd 10K sq/ft alert bldg/ safed $20M arcft/enabled 120 sorties--boosted PACAF no-fly msn
- Mng'd horizontal const/15 Amn; fab'd 600 ft forms/set 7.1K ft rebar f/5.8K ft² pad--adv'd $1.5M proj f/UN T-L presence
- Moved 5K sq ft shelter--relocat'd fire stn--increas'd flightline response time/lauded by 405 AEG/CC--promote
- OPS flight Roof SME; evaluated structural integrity of >xxx roofs--xx $xxxM projects prep'd for execution
- Ops HQ reno SME; instl'd 2.5K sqft carpet tile/readied War Room f/SIPR capes--restored $9M bldg/primed alt Wg UCC
- Orchestrated construction Combat Outpost mess hall--built 600 sq ft fac--improved QoL for 120 warfighters
- Orchestrated short notice afld proj; coord'd w/ afld mgt/comm/CE--supt'd $300K ILS install; grp CC coined tm
- Overhauled C-17 load shoring for $9M HH-60 Pavehawk transport--aided 54 spec ops msns/huge COIN boost
- Oversaw Facility Condition Assessments (FCAs); provided data mgmt/analytical spt/projected bldg life cycle
- Oversaw fltln mx proj; built 2K sf bldg/$500K equip storage sys--supported CV-22 acft beddown/future msns
- Oversaw Wg CC tng; instructed safety/tool use/secured gable end decking--demonstrated AFSC methods/procedures
- Performed duties as UFPM, essential to sq's 98% pass rate/37% "excellent" tempo--validated unit's fit to fight
- Phenomenal Amn! Drove mx for 6.8K facs valued at $7.9B & deployed combat engineer for 6+ mos to Balad
- Piloted $140K FD flashover chamber; designed/placed 20 cy pad--1st simulator in AETC; 100 firemen trnd/yr
- Piloted foundation build for 4K sf warehouse; placed 95 yds of concrete--poised to secure $130K FMO assets
- Placed 2K concrete masonry units--constructed 900 sq ft secure room--secured $65K secret comm equipment
- Planned/programmed/surveyed $12M worth of future constr; reviewed/corrected 4 designs/BOMs in 2 days
- Prevented target range shut down, removed lead hazard/replaced 47 support beams--extended life for 2 years
- Rebuilt 50 ventilation devices--enhanced climate control/denied wildlife access--improved QoL 75 residents
- Rectifi'd 2 down'd hangar doors; repari'd 4 fray'd cables--enabled cont F-18 flt trng/0 delays/safed $57M asset
- Refinished outdoor rec parking; provided angled trailer spots/remedied handicap parking--protected $2.3M property
- Reignited JB sign shop production; fab'd 40 signs/comp'd 25 w/o in 5 days--incr'd efficiency 50%/elim'd 3 mo backlog
- Remodeled two PDE offices; demolished & finished 5K square-foot area--launched Wg KC-46 utilization plan
- Removed damaged vents--installed 30 air diffusers--created pleasant atmosphere for future BAFB Club events
- Renovated 1.1K-sq-ft Anaconda PAX terminal; upped mission capability 50%/no delays on DoD's busiest hub
- Renovated 3K sq ft DFAC; installed 2.4K ft grid/700 tiles--improved area for 50 employees/avoided $150K contract
- Repair'd aluminum gate; fabricated/welded 38 ln ft support bracket--prevented airfield incursion from wildlife
- Repaired $25K vault door, repaired faulty linkage during 5-yr preventive mx--enabled secure SIPRNET ops
- Repaired 15 holes in base Dormitory drywall; installed/textured/painted--corrected fire inspection write-up
- Repaired dormitory stairwells; secured 144 individual kick plate steps--avoided hazard environment for 300 residents
- Rescued FD crash door/freed $1M fire truck; afld emergency response online <1 hr/vital safety for $3B in acft
- Restored caution area; rolled 3K ft reflective paint for emergency response--prevented damage/$2.8M equip/vehicles
- Revamp'd HVAC sys; built/install'd 6.7K cu ft duct/380 ln ft metal frame--restor'd climate controls to 42 prsnl
- Revamped base entry corridor; removed/replaced 30 stones--strengthened structural integrity/mitigated deterioration
- Revitalized bldg 87 office area; preped/framed/drywalled union employee section--saved $40k in contract cost
- Revitalized six water damaged dorm rms; patched/textured/painted 45 sq ft drywall--increased dorm capacity by 2%
- Safeguarded PL3 assets; led 2 prsnl/collab'd w/ 2 orgs/repaired 320 ft fence--secured afld perimeter f/44 acft/$9.6B fleet
- Section VCO; managed $xxxx in AF assets/conducted wkly briefs--expedited maintenance with zero mishaps
- Secured weapons and classified materials, retrofitted vault with high security lock--increased protection 75%
- Selflessly dedicated 15hrs+ for Escort duty; safeguarded 20+ civilian contractors--vital for physical security
- Shared 528 memes across $1B social platform; gain'd 6.8k likes/1.5k comments w/in 1 yr--restored QoL f/ 10k DoD prsnl
- Skillfully enhanc'd building security, securing () doors; solution protect'd $30M classified materials/resources
- SME f/$1.75M TOC fac; erected 40 tons struct steel/seamed 56 purlins--adv'd CENTCOM reqmnt f/$160M LSA re-loc
- Spearheaded tng proj; directed $51K material/2K hrs/10 Amn/1K blocks/doors/windows--verbally lauded by Wg CC
- Sq's CFC representative, ensured 100% personal contact--wg earned $303K/surpassed established goal 30%
- Steered team of 5--built critical tactical stand for new radar--increased range by 60 miles; aided 10K+ sorties
- Structural team led at Silver Flag deployment trng crs, assembled tents/repaired arfld--team coined by cadre
- Supervised concrete pour, alleviated tripping hazard/set foundation--120 cubic meters/$92K project on track
- Supported ALS annual benefit 5K/10K/marathon; supplied tents/tables/stakes--112 participants/raised $4K donations
- Supported structural craftsman repair/maintenance/rwp teams; closed 1.3K job orders--90% on-time comp rate
- Surveyed/prepped 800 LF sidewalk; constructed/poured 48 CM concrete--provided safe walkways for residents
- Tackled $352K high voltage proj; excavated 8K ft/set 3-phase line--in-house man-hrs svd $1.7M; MSgt now!
- Trained 14 Polish Soldiers--built 133K sq ft AM-2 airfield--enabled close air support to 35K NATO fighters
- Troubleshot hangar door, utilized hand-fabricated tool/overrode main controls--secured Priority Level 1 assets
- Updated building floor plans; provided drafting support for HTACC and KCOIC--100% accuracy achieved
- Vital f/2 Gp events; collect'd 45 vols/160 ABUs/vamp'd 70K sq ft CE park--gear'd 28 CAP mbrs/prep'd f/74 functions
- Vital in $140K FD trng aid; fab'd 2 conexes into flashover chambers--supports 900 area firemen/svd AF $44K
- Vital Wg EET mbr/4 Wg Ex; efforts exceeded 100 objectives w/ no major discrepancies--56 FW mission rdy
- Volunteered setup/teardown CE haunted house; escorted 1,886 patrons--raised $2,970/711 lbs of canned goods
- Weatherized WG HQ; applied Sikaflex sealant to 300 glass panes--prevent'd heath hazard/damage $19.5M fac