eprbulletsafsc.com

AFSC 3E5X1 Engineering EPR Bullets

See also: Geospatial/Geographic Information Awards

See also: Civil Engineering Award Examples


Key Duties

- Conducts facility surveys & preliminary engineering site inspections; supporting the AF's #1 deployed wg/968 sq yds
- NCOIC assistant & directs 3 mil; provides CAD drafting & mapping capes for proj development to spt $1.3B budget
- Prime Beef Engineer Emergency Force team member; deploys in support of AEF/USSOCOM mission requirements
- Prime BEEF trainer; coordinates AFSC upgrade training & contingency activities for 15 mil mbrs through 6 sections

- Assists NCOIC/supervises 9 Amn/provides drafting/mapping capes for project development to support $1.3B budget
- Focuses Geographic Info Sys to deliver mapping reqmts for $19.1M infrastructure expenditures/970 bldgs/6.6K acres
- Conducts facility surveys & preliminary site inspections; supporting 76 acft/968 sq yd airfield/AF's most deployed Wg
- Supervises 1 engineering tech to provide drafting & mapping capes for project development to support $1.3B budget

- Develops/conducts lesson plans; trains/instructs on AFSC core tasks; evaluates personnel for skill level upgrade
- Assigned to Prime BEEF mobility team E1, ready to deploy at a moments notice to project global reach/power
- Geobase NCOIC--supervises 7 Amn; oversees the development/management of base maps and the JBER CIP
- Leads/conducts plane/geographic/geodetic surveys; incorporates all spatial data into base mapping platforms


Accomplishments

- 1st choice for interim NCOIC/8 wks; directed 4 Amn/44 civil design projs/$1.2M--vital to AFSOC '20 CE Sq Yr Awd




- Accelerated UGT; instructed 9 Amn AFS core tasks over 72 hrs--increased shop capes by 15%/2 Amn fully upgraded
- Aced 24-hr radiation safety course--fully qualified to perform precision construction measurements worldwide
- Aced 3 Trimble surveying eqpt online courses; learned/taught enhanced techniques--bolstered shop capes 5%
- Administered $2.75M flightline construction proj; removed 5K ft of rubber/painted 1K LF--zero sortie delays

- Advance CIP; maintained critical data for 8 mi/119K ft² pavements/778 bldgs/43 mi utilities--est'd 5-yr expansion plan
- Advanced FOB security; corrected 108K sq ft lighting/fence repair plan--secured $52M assets/160 warfighters
- AFS lead on $65K remodel proj; led 5 Amn/coord'd w/5 crafts on 5.6K ft² renovation--devised mtg forum for 274 pers
- Aided $5.6M DoD BS/BSI design; surveyed 3K pts/76 acre site--enabled 1.5K prsnl beddown w/262 mile AOR security

- Aided confined-space location proj; surveyed 35 locations--produced trackable excel database for 15 agencies
- Aided floorplan approval process; QA'd 198 plans/drafted 9 facilities/93% insp'd ahead of schedule promote
- Aided SFS weapons fac insp; perf'd 4 compression tests f/2 ranges--safeguarded firing platform/re-qual'd artillery site
- Aided SGC utility proj; set 3.5K LF electrical line/5 junction vaults--sighted permanent power f/$4.7M/278K BS site

- Aided site layout on $927K Supply admin/storage facilities--yielded critical depot for combat mission supplies
- Alleviated historical flooding area; designed $750K drainage proj--safeguarded 120 buildings/2K combat psnl
- Ambassador to local community; designed 108 space parking plan for DM-50 Car Show--uplifted 3K families
- Applied floorplan verification process; utilized S-file space mgt tool on 417 bldgs--cut facility footprint 20%

- Assisted $250K flightline asphalt proj; added new 600-ton "Snowbird" ramp--aircraft capacity increased 15%
- Assisted dormitory carpet contractor; provided 5 floorplans/interior dimensions--boosted QoL for 150 airman
- Assisted floorplan verification processes; eval'd 30 plans/facility renovations--23 bldg insp's comp'd on-time
- Assisted SGC drainage project; key team mbr /surveyed 148 grade stakes/elim'd 19 acre flood zone--Sq/CC #1 priority

- Assisted Traffic Sign implementation; developed informational signs for retirees--enabled smooth transition
- Authored map books; dsgn'd 17 guides f/28 escorts--empowered mobility f/$38.2M construction projs/5K flying hrs/yr




- Bolstered AF's largest PR ex; surveyed 91 bldgs for 3K JTF prsnl beddown--enabled 18 jt events/657 sorties
- Bolstered EOD's survival land navigation tng; developed MGRS grid/contour NAVAID--spt'd 19 psnl/12 ex/yr




- Calculated detailed magnet school estimates; presented 2 pers/material plans to sq CC--unveiled $17K in savings
- Cert SFS augmentee; safeguarded DM for 5 events/prevented 7 unauthorized entries--protected $8B in assets
- Chaired $3.5M afld sunshade project; led 7 mil/ID'd/repaired 29 afld discrepancies--enabled 5th gen acft deployed fleet
- Championed sq move of 50 psnl; transferred 284K lbs/$1.5M assets/37K blueprints--awarded CES/CC trophy

- Co-led $467K bathroom renovation; asst'd 4 design mtgs/insp'd 582 ft� fac--restored 19th century style JB DV lodging
- Collected 1.9K data pts < 3 days; surveyed 72K ft MFH roads--updated DM CIP/verified 362K sq yds asphalt
- Compl'd water/sewer utilities install; excavated 1.1K ft trench/placed 5K ft pipe--progressed 3 RTV PEB proj's/$4.3M
- Completed 3 Trimble equipment online classes; learned & taught enhanced techniques--boosted shop capes 5%

- Conducted ramp parking survey; collected 30 pts/created new paint design--provided new arcrft parking area
- Construction resource; developed 4 power outage maps--supported 34 mx renovation projs w/ $30M in FY14
- Coord'd $325K FAMCAMP shower/laundry fac; enforced specs--defeated safety issue/imp'd QoL 400 people
- Coord'd SF street sign survey; captured 200 GPS pts/ID'd speed limit zones--created 1st speed zone LE mapbook tool

- Coordinated 22K LM housing survey; 2 Amn/1.9K data pts<3 days--updated DM CIP/verified 219K SM matl
- Coordinated 6 prsnl, 322-acre survey; delineated 3 mile proj boundary--prepared $192K AF/BLM land swap
- Crafted 40 hr ex; trained 20 mbrs on beddown TTPs/OPLAN--fortified Wing CC's contingency response vision
- Crafted FY18 IPL; created 14 projs/$8.9M f/AFCENT funding--spt'd $143M Master Plan/Wg/CC "Best seen to date"

- Created $25K EOD renovation plan; reallocated 1.2K sq ft psnl workspace--increased manning capacity 30%
- Created critical route map for EM ex; coord'd w/ 7 agencies/crushed timeline < 1 hr--response time cut in 1/2
- Created vital O-3 crash grid map; slashed HAZMAT/1st response time in 1/2--coined by Aeromedical Sq CC
- Critical asset during DM-50 picnic; created site layout/bus routes--fostered base/city relations of 4K+ patrons

- Critical to $50K contractor vs. in-house cost savings; trained 3 Amn on $21K design--mitigated FDEP $25K fine/day
- Critical to $50K ktr vs. in-house savings; trn'd 3 pers/finalized crit $21K drainage design--nixed FDEP $25K fine/day
- Crucial to CEF fire hydrant survey; 553 points collected/210 surveying hrs--decreased 1st responder time 10%
- Customer satisfaction focused; 92% rate (5101/5592) on time--6% rise over previous year w/400 more WOs




- Dedicated 300 hrs to TXDOT/TTI crs; achieved civil engineer/project mgt certs--enhanced career knowledge/toolbox
- Dedicated pro; motivated in challenging aspects of engineering assistant career field--promote ahead of peers!
- Delineated FW/CC base access policy; resolved AB entry issues w/ 4 agencies--zero delays/32 proj/$604M
- Demolished 7 condemned facs; prepped $52K asbestos remediation--6K sf redux, tackled AF 20/20 initiative

- Deployed 177 days ISO Op SPARTAN SHIELD; EA shift lead/mng'd 5 engineers--spt'd 483K cmbt sorties/18 EKIA
- Deployed as SEL; managed 50 RH engineers-construct 4 k-spans & MSA expnsn/$3.5M/incrs'd AFCENT war capes
- Deployed NCOIC ISO Op SPARTAN SHIELD/211 days; led 9 EA's/spt'd 50 projs--enabled 1.1K cmbt sort/18 EKIA
- Design team lead/$40K CATM proj; improved 1.5K sf latrine--boosted QoL for 5K psnl/saved AF $2K annly

- Designed $25K EOD renovation plan; reallocated 1.2K sq ft psnl workspace--increased manning capacity 30%
- Designed $40K CATM renovation; revamped 1.5K sf latrine--amplified QoL for 5K psnl/saved AF $2K annly
- Designed $5.7M afld proj; sited 7 hangars, survey'd 411K sq ft ramp--2x ramp space f/7 MQ-9/MQ-1 UAV beddown
- Designed 2 schools/2 clinics; drafted 50+ drawings--provided education/med care 450K impoverished LN's

- Designed 92K sqft LSA expansion; secured $378K funds--increased lodging cap 12%/spt'd 900 pers surge all <3wk!
- Designed light sys upgrade at 3 GSUs; slashed 364K kWH, $2M yearly--5 yrs ahead of DoD 2020 energy redux goal
- Devised helo LZ design; created $1.4M plan/sync'd jt reqmts/guided 594K ft² build--increased evac response time 40%
- Directed $3.5M afld sunshade proj; surveyed/ID'd 29 afld discreps/advised 3 rpr COAs--paved way for 5th gen acft ops

- Directed 20th Street project survey; gathered utilities info/200+ topo pts/86k sf--saved $300K in contract costs
- Directed CIP sys; sustained 6.6K acres/970 bldgs/583K mi utility data--enabled $207M/74 proj prgm/AF's 3rd lrgst Wg
- Directed fuel farm upgrade; led 3 Amn/leveled 9 berms--safed 2M gal/incrs'd fuel supply 150%/postured O-plan surge
- Drafted $194M KC-46 beddown projs; sited 2.1M sf free zone/debris haul route--expedited const/FY16 ready

- Drafted Niamey perimeter rd; mitigated flooding/eliminated txwy traffic--secured $80K proj/improved AC ops
- Drove $125K marina proj; led 3 pers/drafted 4 designs--ensured $680K yrly profit/QoL for 25K/earned Amn of 3rd Qtr
- Drove $190K security lighting install proj; designed $900K USMC rifle range bldg--enabled weapons qual f/8K jt prsnl
- Drove $2.7M utility proj; led 5 pers sur tm/captured 1.5K pts/staked 12K sq ft--averted flood haz f/2 F-35/F-16 facs

- Drove $2.2M K-span proj; tm'd w/1 ECEG/sited 2K points/analyzed 20 soil tests--expanded acft mx capes 22K sq ft
- Drove $415K bldg dwg contract; set timeline/mng'd 6 mil/163 facilities--reduced time 20%/averted $163K add'l costs
- Drove $5M Infrastr Strat plan; integrated AEW/OPLAN input--dialed-in crit msn capes/penned 10-yr base build-out
- Drove base road survey; captured 1.5K pts/188K sf asphalt--saved $44.8K/sq Amn 2nd Qtr '14...ready for SrA

- Drove cargo marshalling proj; GPS'd & set 46 flightline anchors--cleared 15-yr write-up in air-traffic sys eval
- Drove DM's Gate Traffic study; monitored sensors/identified new Base ECP hrs--saved AF 2.5K man hrs yrly
- Drove Hurricane rcvry; led 8/ID'd $300K bridge rpr/safed 200K/wkly commuters--captured AFSOC CE '20 Sq of Yr
- Drove hurricane rcvy; mng'd 21 pers/expedited survey/ID'd $500K bridge damage--protected 200K commuters/week




- Enabled $250K flightline asphalt proj; facilitated 600-ton "Snowbird" ramp install--boosted acft capacity 15%
- Enabled CEX CBRN Cell SA; crafted EM 1:50000 MGRS map--defined MOPP level/protected 6297 mil psnl
- Enabled solar-array ribbon-cutting; created 2 route maps for DV visit--rapid turnaround granted timely arrival
- Engineer Flight VCO--monitored 6-vehicle/$142K account--assured squadron resources promptly available

- Engineered D-8 Safety map; tailored QD arcs/ammo routes for 29B ECP--settled FW/SEW yrly discrepancies
- Engr'd floorplan verification processes; eval'd 498 plans/facility renovations--322 bldg insp's comp'd on-time
- Enhanced ex planning capability; dev'd 12 logistics supply routes/10 mi convoy map--enabled 6 LRS trng msns
- EOC AFS lead during JBER windstorm; oversaw 3 amn/damage tracker/map support--lauded by EOC director

- Erected $150K MSA fence; directed 6 mbrs/18 insps/mapped 15 sites--secured $109M muns/readied ACE msn tasks
- Est'd PSAB's 1st jt force response across 8 AoRs; led 3/elevated op capes 20%--coined by Brig Gen, SFS/CC & CE/CC
- Established 42 survey benchmarks; gathered 320 hrs GPS data--increased survey accuracy/coverage area 75%
- Excellent engineering support for $9.4M construction prgm--expedited project planning & design for site leads

- Executed $25M/77K sf AMARG hangar; attained LEED Silver w/ 20-kW PV array--reduced energy $5K annly
- Executed 1.6M sf runway survey; located 2.7K spalls--addressed 51 FW/CC #1 priority/averted costly closure
- Executed 200K sq ft topographic survey; data ID'd housing flood areas for rpr--saved $250K in contract costs
- Executed ACC's premier MILCON prgm; 17 projs/$216M UC/design--enabled HC-130J beddown/fuel system

- Executed exercise beddown of 3K psnl; supported 23 nations/657 sorties--coined by CC for unrelenting efforts
- Expedited emer work order completion; authored 10 vehicle quick-ref mapbooks--63% redux in response time
- Expeditiously surveyed airfield during ORE; plotted 19 craters & 2 spall fields--briefed MOS selection to CC




- Facilitated $20M EC-130H flt sim proj; ID'd 3 design deficiencies--saved AF $33.6M TDY/fuel/tng hours yrly
- Facilitated $2M ALS renovation/demo; met ACC Green Design/Development rqmt--aided 20/20 by 2020 obj
- Facilitated $616K renovation; procured crit workspace, prevented 5 mo delay/termination--lauded by USAFE
- Facilitated $700K 29B Gate proj; inspected barriers for acceptance--increased base evac capabilities & safety

- Facilitated 35k flightline restoration proj; cleared 5k ft rubber/repainted tacan/taxilines--rectified 7 UEI flaws
- Facilitated 4 way stop install; performed critical Safety/CE traffic analysis--averted 5 potential collisions yrly
- Facilitated DOT photogrammetry proj; established survey control/procured DM imagery--averted AF $150K
- Facilitated KMC eqpmt inventory tm; validated 21 new fac loc's/five utility sys's--ensured $8M for future RAB proj's

- Filled Sq Training Manager billet; coord'd heavy eqpmt certification f/17 mbrs--increas'd snow team man-power 20%
- Fixed elevation discrepency; teamed w/ South Dakota ARNG--erased 2 wk proj delay; garnered warrior of wk
- Flawlessly emplaced four survey control points--increased Taji control precision from 10m to less than 2cm
- Flt Equip Custodian/PMEL monitor; inventoried/org'd $1.5M in HS/PB surveying assets--rectified equip flaws

- Fostered NED/Belgian AF partnership; engineered 30K SF $308K emergency taxiway repairs--safed 6 F-16s/$113M




- Gained invaluable knowledge; completed 20-hr Skillsoft Leading w/o Authority--intensified leadership skills
- GIS guru for DM's Heritage Conf/Air Show; created 37 maps/coord'd w/ 15 orgs--prep'd for 150K spectators
- Governed airshow mapping plan; coord'd w/ 7 agencies across wing--Tucson/base relations 250K+ spectators
- Guided $340K MFH paint restoration; inspected 3 facs/120K sq ft daily--improv'd QoL for 432 Amn residents
- Guided 4 Amn/$415K contract; updated 163 floor plans/60 hrs--saved $163K add'l costs/solidified 8K in mil funding
- Guided fuel farm repair; led 3 mbrs/fixed 9 berms--safed 2M gal/increased fuel supply 150%/postured for O-Plan surge




- Hand-picked interim NCOIC for 8 wks; directed 4 Amn/completed 44 jobs/$1.2M--vital to AFSOC '20 CE Sq Yr Awd
- Headed hurricane rcvy; instructed 21 mil/expedited survey/ID'd $500K bridge damage--safed 200K commuters/week
- Helped update afld waiver; surveyed Whiskey Ramp/fence line--id'd/plotted 6 afld clearance line violations




- ID'd 18 equipment accuracy errors; recalibrated 6 TSC-2 data collectors--increased EA survey/WO caps 25%
- Id'd muns storage shortfall; GPS'd 2 bldgs/verified quantitative distances--protected $59M stockpile/150 prsnl
- ID'd patriot msl site hazard; org'd radar move/cordon'd 13 acre safe zone--protect'd 21 prsnl/upheld Jt msn/$1B USA proj
- Id'd yrs old MSA data discrepancy; enabled appropriate action--afforded protection to $59M muns stockpile/150 prsnl

- Improved OSI capacity; provided base maps/mapbooks--reduced response times/increased planning capability
- Initiated AFSO21 elec work request process; 1st in AETC instituting streamlined handling; saves 500 mhrs/yr
- Inspected construction proj quality; test'd slump f/concrete pads--enforc'd stds f/$246K Sentinel proj/14 AOR msl sites
- Inspected Golf crs ofc/$105K; enabled modified roof and vent sys/6K sq ft--averted future leaks/deterioration

- Installed six prsnl doors; replaced damaged/inefficient doors--crucial security & energy vulnerabilities averted
- Integral to CEP facility move; 25 psnl/$1.5M assets w/ zero msn delay--actions warranted coveted CES trophy
- Interim flt superintendent; filled in as flt superintendent for 6 weeks--ensured team efficiency/upgr'd 2 amn 5 skill lvl's
- Invaluable knowledge; completed 40-hr Radiation Safety Officer trng--earned American Concrete Institute cert

- Inventoried/organized/tested $1.5M EA HS/PB assets; id'd equipment shortfalls--facilitated equip reallocation




- Key CEN spt for Wg IG Aircraft Crash ex; generated crash trajectory map--train'd 8/mishap response team rdy
- Key CEN spt for Wg IG Aircraft Crash ex; surveyed 86 acft parts/debris--trained 8/mishap response team rdy
- Key mbr, Jt Capability Technology Demo; eval'd afld damage rpr equip/materiel--set stage for future upgrades
- Key member Sq proj review board; expedited 35 DSWs/24 work orders/18 MACC proj's--shield'd constr for 71 bldgs

- Key player in Rockex exercise; gained zero deficiencies in processing line--maintained LRAFB excellent rating
- Key to $228K asbestos abatement; designed 2 dorm demo/47K sq ft redux--increased life/health/safety for 135 residents
- Knocked out 65 work orders; accomplished 70 hrs of afld survey--bolstered $17M afld pavement/striping projects




- Launched sq fire extinguisher trainer class; enabled 7 safety reps to train Amn--base-wide life saving potential
- Lead design EA on $927K Supply admin/storage facilities--yielded critical depot for combat mission supplies
- Lead eng tech for $65K Checkpoint Five K-Span--improved RH increment inspection before aircraft loading
- Lead insp f/$630K CDC reno; rpr'd deteriorating fac/15 rooms--ensured safety f/150 kids/lauded by Director

- Lead trainer for 5 mil; est'd trng/certified 94 tasks/mentored 2 on CCAF--secured journeymans/adv'd degrees by 16%
- Led $1.1M Air & Space Museum proj; conducted daily MILCON insps-- enhanced exp f/100K visitors yrly
- Led $1.2M dorm parking lot survey; GPS'd 609 data pts--enabled AT/FP measures/restored safety for 249 psnl
- Led $1.4M fire lane repair proj; corrected 7 NFPA design deficiencies--safed $13B shipyard assests f/52K naval prsnl

- Led $3.9M dorm renovation; maintained oversight/ID'd 13 LHS issues--up'd QoL for 59 Amn/saved AF $16M
- Led $310K Chapel renovation; conducted 90 site inspections/replaced 22K sq ft roof--improv'd QoL/500 pers
- Led 12 engineering assistants; mng'd 58 construction projects worth $63M--spt'd $165M MILCON prgm/$1.7B assets
- Led 2-hr contingency trng; prep'd 11 Amn for ADAT proc--boosted shop capes 5%/ensured efficient UXO & fac recce

- Led 20th Street construction survey; gathered utilities info/200+ topo pts/86k sf--saved $300K in contract costs
- Led 3.8K sq ft concrete pad site plan; trained 5 Amn in expeditionary skillset--maintained #1 HST 2 yrs in row
- Led 4 pers AMARG survey; plotted 6.9K LF/1.1M sq ft area--provided AT/FP measure for 345 assets/$1.04B
- Led 4-man escort team on $2.8M flightline construction proj; rectified 8 FOD hazards--zero time/sortie delays

- Led 4-pers acft mishap survey team; completed 2 crash scenarios/bio-safety tng--ensured shop disaster readiness Rdy
- Led 6 traffic studies; coord'd 4-way stop/cut gate guard reqmt 2.5K man-hrs--averted 6 maj vehicle mishaps/yr
- Led 7-man team; surveyed Class B a/c mishap, ID'd 20 rwy hazards, 4 BAK-12--cut 2 wks/$5K contract costs
- Led AMARG hangar proj escort; safed transport route/106 truckloads for 16 hrs--zero mishaps/work stoppage

- Led base/A-10 ramp storm damage eval; inspected/mapped 324 work requests/551 piers--enabled $841k proj
- Led CEP relocation of 25 psnl; transfered 142 tons/$1.5M assets/37K fac drawings--awarded CES/CC trophy
- Led Chabelley Afld infra survey; pulled 15 as-builts/334 objects/14K items--secur'd $2.5M facility sustainment funds
- Led contingency crash survey training; marked 31 pts covering 95k sf--9 pers shop contingency training ensured

- Led design/layout of DM-50 Car Show parking plan; 118 spots marked/120 hrs/10 Amn--3K+ local attendees
- Led development of RH first approved OML rating sys; ensured fair and equitable promotions--ID future RH leaders
- Led expedient site layouts on $1.1M CSAR admin/storage facilities--yielded critical depot for combat mission
- Led flight UGT/9 Amn; dvlp'd comprehensive trng plan/certified 47 core tasks--secured 5-skill lvl for 4 AD/1 Guard

- Led incinerator survey; plotted 1K pts & drafted layout w/ prevailing winds--improved air quality for 2K psnl
- Led JBER Airshow pedestrian parking survey; staked out 9k spaces & 500 pts--maximiz'd visitor access/safety
- Led jt svc survey tm; trn'd 2 mbrs mapping/GPS equip/site-prep ops--incrs'd interoperability/enabled 60 pers beddown
- Led material testing tm; survey'd 2 radar mounds/conduct'd 20 compaction tests--secur'd $480K proj/ERHS ToQ awd

- Led New Horizons msx survey team; singlehandedly sited 32K sf/$XXK facilities--accelerated schedule 10%
- Led redesign of floor/site plan for $676K logistics bldg; sited add'l 20K SF--vital component to unit readiness
- Led UGT/5 Amn; built trng plan/certified 94 tasks/counseled 2 on CCAF--secured journeyman/adv'd degrees by 16%




- Managed $213K AMARG fence proj; coord'd construction of 3 areas/1.1M sf--secured $1.04B DRMO assets
- Managed $25M HN runway rpr; partnered w/USACE & 5 coalition nations--enabled $1.1B acft/6K combat sorties/yr
- Managed $3.9M dorm proj; ID'd/corrected 18 fire protection/structural errors--saved $51K/up'd 84 psnl QoL
- Managed $5.9M HC-130J/allied spt bldg proj; ID'd 4 safety violations--avoid'd 2 proj delays/saved AF $5.4K

- Managed 4 CM/3 proj/$11.8M; ID'd/fixed 22 LHS errors/demo'd 15K SF--saved AF $51K/reduced footprint
- Managed 5 construction projs/$1.2M; conducted 300 QA/QC inspections--ensured 100% on-time completion
- Managed 5 mil/7 civ; comp'd 14 const projs/$7M bldg reqmnts--efforts key to 13' AF MG Robert H. Curtain award
- Managed Alert DET AT/FP fence proj; ID'd 20 deficiencies, rdy for IDS install--safeguarded ONE acft & psnl

- Managed BDOC relocation; staked 175 ft cable, 640 sq ft structure, $58.5K assets--amplified RAB base defense msn
- Managed C2/Ops ctrs; oversee tracker/procurement/5 AFCENT projects/$3.5M--provide cc topcover for 50 eng prsnl
- Managed JBER Arctic Thunder survey; marked 48 acrft parking locations/68 booths--enjoyed by 200k+ locals
- Managed Type III fuel proj/$23M; coord'd install of 9 fuel pits--cut refueling time 33%/restored full msn capes

- Mng'd $1M GATF proj; cmd'd 10 site visits/utility install f/8.7K ft trn'g facility--key to '18 CINC IE awd/1 of 82 bases
- Mng'd $480K locker room MOD; ID'd 20 inspection shortfalls & provided viable solutions--increased QoL f/60K mbrs
- Mng'd bldg 2300 floorplan upgrade; modified SARC/Wg Plans footprint--mitigated flawed fire evacuation plan
- Mng'd confined-space id prgm; codified 3 hydrant/comm pts--fortified in-place database for 15 base svc agents

- Mng'd EOD berm proj; calc'd 10.5K cubic feet volume--mitigated 5-yr safety defect/AFM 91-201 compliance
- Motivated team player--deployed equip custodian--efforts support $60K of equip New Horizon deployment




- Ops Chief f/150+ RH eng; maintained 90% prsnl readiness--produced 90 deployed Amn/suprt RCP 6/AFCENT msns
- Optimized LAFB HQ building; designed 621sq ft floorplan/11 new work stations--increased unit production by 37%
- Organized $2.75M afld surface repair; oversaw 650 T/8.6 acre asphalt placement--hiked sortie capability 15%
- Organized 272 acre AFCEC survey; captured 20K data points--prevent'd 6 month contract delay f/$143M const prgm

- Organized/equipped 4 escorts; $100K airfield repair and rubber removal proj/4 days--ensured safe flight ops
- Oversaw $1.1M FPS install; reviewed/approved 11 product submittals--protected comm bldgs worth $10.3M
- Oversaw $2.4M construction proj; supported 248 contracts/mng'd 23 PM designs--safed $14B assets/awd'd Sq ToQ1 '18
- Oversaw $666K warehouse electrical proj; safeguarded $5M in equip--energy reduction saved AF $172K/yr

- Oversaw crane waiver prgm; liased w/14 orgs, drafted 2 obstruction pkgs--fortified 17 ktrs/val'd 5K req'd flying hrs/yr
- Oversaw DM's Traffic Engr posn; id'd new base ECP hrs/facilitated 4-way stop install--saved AF 2.5k hrs yrly
- Oversaw GeoBase Program; complet'd 120 GIS requests/500 maps--supported 1.6K prsnl/436 facilities/18 acft assets
- Oversaw HC-130J Joint Use Fuel Cell; rectified 2 major design flaws--prevented delays/$12.5M proj on track

- Oversaw JBER site summit survey; led 4 pers survey team/placed 75 points--$1.8M installation range secured
- Oversaw JBER street sign survey; collected 10K safety/GPS data points--90 days ahead of HQ req'd time line
- Oversaw Monitoring/inspections 190 Self Help work orders; ordered $10K in materials--saved $50K in contracted labor




- Participated in 2K ft sidewalk proj; placed $34K concrete/50-ton topsoil--safe path for 10K APEC spectators
- Paved way for MOUT site; led 3-day/462 point/9 acre survey--created local trng for 8 agencies/multiple MDS
- Performed laboratory MC tests on RH quarry base coarse--ensured product IAW EPA dust emission standard
- Phase II ORE map authority; dev'd base/DLC/MXG defense sectors/NBC zone map--safeguarded 2.5K ex psnl

- Piloted 31 pers emer plan; crafted base flood map/129 bldgs/23M ft²--nixed vulnerabilities for $731M AFSOC bldgs
- Piloted high-vis Wg bldg rpr/12K sq ft/$206K; extend'd roof life expectancy 3 yrs--improv'd QoL for 200 pers
- Piloted SecDef JBPH-H #1 pri; dvlp'd SOW f/7 ECPs/ID'd hold lines f/base entry--secur'd drone concern/80K base pop
- Pinpointed sewage failure; enabled removal/replacement 285 tons material--dodged Cust Service interruption

- Pioneered DM's 1st virtual vault; expeditiously digitized 37K blueprints <1 yr; increased record 65%
- Pivotal construction resource; created 21 outage maps--facilitated 25 mx renovation projs w/ $140M in FY13
- Pivotal to Army's 3rd SF land navigation trng; produced 25 grid maps of Southern AZ--validated 25K sq miles
- Pivotal to DM ORE prep; coord'd w/ 10 sqs, updated 121 EM/geospatial maps--crushed ACC reqmt < 2 days

- Postured ACC's top lodging proj/$52M/350 rooms; executed $673K utility upgrade--saves $6.5M TDY cost/yr
- Powered in-house constr team--$300K/10 facs; 60% < cntr, $450K avail for other wg proj--Wg Best Practice
- Prep'd $3M AMARG T-10 test cell "Hush House"; led 160-point/54K sq ft topographic survey--promote now!
- Prep'd 5K gal subgrade tank demo rqmt; assured ADEQ/EPA compliance--clinched $50k proj...promote now!

- Prepared $3M T-10 Engine Test Cell; solved sound/vibration issue--siting approved/averted 10% funding loss
- Promoted confined-space location proj; surveyed 3 objects--produced trackable database for 15 svc agencies
- Promoted vault maintenance; processed 3 as-builts/organized 95 drawings--aided floor plan retrieval process
- Provided LRS w/ construction story boards; outlined 3 proj valued $32M--captured oversight for inbound CC




- QA'd $3M afld spt contract; coord'd 53 rqmts, 354 line items--safed 10 sites across 5 African nations, 600 sorties/mo
- QB'd CENTCOM/CC #1 pri; sited $400K radar area/prepped $2B MWS platform--vital to AFSOC '20 CE Sq Yr Awd
- QB'd CENTCOM/CC #1 priority; prep'd $400K proj site for $2B missile platform--garnered ALS Distinguished Grad!




- Rectified 100m IDF tracking error; surveyed/aligned 3 KAF radar towers--cut error 90%/protected 25K psnl
- Rectified base property line; applied GPS data to 10K acres/returned 7 acres--amended 27 year old boundary
- Recuperated 3-shop equip account; removed $10K obsolete assets/fixed 26-yr oversight--saved 32 man-hrs/yr
- Renovated 61 yr-old CATM fac; 6 AFSs/$35K/1.1K hrs--redux contract spt cost $2.1K/spt'd 6K shooters yrly

- Revamped crash grid map; validated critical zones/QD arcs--delivered Wg 51 controlled emer response maps
- Revamped D-8 Safety map; tailored QD arcs/Ammo routes for 29B ECP--BTZ SrA promotion well deserved!
- Revamped EM's MGRS response map; depicted critical zones/QD Arcs--distributed 50 maps to base agencies
- Revamped maps for 2012/2013 ORE; eliminated potential write ups--Wing now in full compliance/zero issues

- Revived Nellis infrastr plan; val'd $17.7M projs/1.3K mx tasks--led no fail ops in COVID env/sec'd 25.5K flt hrs/yr
- Road probe SME; coord'd w/3 orgs/org'd 7 route surveys/840 miles--sec'd $35M ICBM assets/0 msl movement delays




- Seized 4 delinquent proj closeouts; ended 2 yr delay in 5 weeks--updated ACES/transferred $2M to RP assets
- Self starter! Tm'd w/SFS/trn'd 4 Amn/sketched 4 accidents/89K ft²--saved 160 hrs/upped investigation verdict by 85%
- Silver Flag tm ldr; crafted 10 maps/adopted f/new curriculum as sim ADVON tm--coined by CC/shaped AFSC skillset
- Skillfully surveyed 43K SF for $706K compound paving proj--mitigated further road degradation/veh damage

- SME for Operational Test Agency; trained ktrs on disaster control ctr set-up/ops--enabled incident response tm
- Spearheaded $250K mold removal proj; sanitized 78 dorm rooms--eliminated health threat to 1.3K prsnl annly
- Spearheaded 12th Air Force map request; printed 10 specialized maps--zero msn delays/lauded by A3 director
- Spearheaded annual insp f/CATM firing range; perf'd 4 soil tests/doc'd 50 results--cert'd range/enabl'd CST f/9.8K prsnl

- Spearheaded CEF fire hydrant survey; collected 553 points/surveyed 210 hrs--slashed 1st responder time 30%
- Spearheaded hurricane recovery; mng'd 6 pers/ID'd $500K damage/awd'd $110K contract--safed 200K commuters/wk
- Spt'd $35K flt line restoration proj; cleared 5K ft rubber/repainted TACAN/taxi lines--ID'd/fixed 7 UEI flaws
- Spt'd AACP "Nightwatch" special msn acft; designed alt NAOC taxi route--ensured 100% compliance w/ UFC

- Spt'd base dev'ment plan; escorted 9 psnl w/in base--secured $530K contract/lauded by FW/CC--promote now
- Spt'd base/A-10 ramp storm damage eval; inspected/mapped 324 work requests/551 piers--enabled $841k proj
- Spt'd Chabelley airfield master area plan; survey'd 4K pts, creat'd 24 maps--shap'd East Africa's security f/next 25 yrs
- Sq POC for SSSN event; coord'd placement of 20 barriers/light-alls/40 hay bales--safed area for 2K DM prsnl

- Steer'd Wg plans; executed 29 projs/$6.26M & prep'd 8 projs/$12.9M f/execution--coined by AFCENT ARC Advisor
- Steered $3.6M UH-60 ramp construction; piloted 643K ft² civil design--safed $213M acft/coined by deployed CE/CC
- Steered $415K A&E contract; prepped 2M ft²/163 bldg dwgs--ensured 8.1K pers duly funded/saved $163K add'tl costs
- Steered lightning protection proj; QA f/10 prsnl/8 insps & comp'd 1 mth AoS--powered 348 facs w/4 $2.5M generators

- Stepped up and accomplished ACI Aggregate Technician course--sharpened proficiency in critical job skills
- Stood-up R&O section; created 33 crit fire drawings f/new fac--protected 35 prsnl, met strict German/US safety regs
- Stood up Top 15 program--4K requests ID'd/validated; Grp CCs focus now integrated into base WO priority
- Streamlined sqdn material acquisitions--implemented new GPC work flow chart training program for squadron

- Strives for constant self improvement; completed Auto CAD civil 3D class--enhanced job skill and knowledge
- Successfully completed ACI Concrete Field Testing Tech course--sharpened proficiency in critical job skills
- Supervised $5.9M afld drainage; led 2 project insps/ID d 4 discrepancies--prevented AETC training Flt flood damage
- Supervised bldg 2300 floor plan update; modified SARC/Wing XP footprints--mitigated flawed fire evac plan

- Supervised the Training of 133 facility managers on the inspecting, reporting responsibilities; ensures upkeep
- Supported $40K CATM renovation; performed outside 3E5 duties--up'd QoL for 5K psnl/saved AF $2K annly
- Supported AF's largest PR ex; surveyed 91 bldgs for 3K JTF prsnl beddown--enabled 18 jt events/657 sorties
- Supported Operation Angel Thunder; led 5 pers survey team--enabled 23 nation/3K psnl HQ site/>650 sorties

- Surveyed 147K sq ft afld; collected 4K grnd elevation pts/40 acft parkings--vital to afld drainage projs/$797K
- Surveyed 2 patriot msl projs/$500K; QB'd 3 mbr tm/plotted 300 waypoints--spt'd incr'd SHORAD capes f/$6.8B WTA
- Surveyed 322-acre missile site; marked 15.8K LF property boundary--facilitated AF 20/20 by 2020 initiative
- Surveyed 950 CY of concrete; Live Ordnance Loading Apron--ensured ordnance safety during pilot exercises

- Surveyed base property line; applied GPS data to 10K acres/returned 7 acres--amended 27 year old boundary
- Sustained Hush House site preparation; conducted 160-point topographic survey--aided $5.4M MILCON proj
- Synchronized w/SFS; trn'd 4 Amn/sketched 4 mishaps/89K ft²--slashed 160 hrs/fast-tracked investigation verdict 85%




- Tackled $8.7M FP job; sited 2.8K barriers/53 bunkers--enabled 75 daily searches/mitigated blast hazard for 2.5K mbrs
- Take charge, high-performance leader; Gp CCC lauded best training pgm 2-yrs running--promote to TSgt now!
- Tm'd w/ Base Ops; rectified 146 map errors <2 mths/synced 11 Sq's afld ops--safed 111 acft/1.2K sorties yrly
- Trained Surinam army advanced surveying techniques; staked out 3 sites/20K sf--bolstered foreign relations

- Trained three 3-lvl amn; oversaw 120 survey hrs/database upload--enhanced shop efficiency/amn upgrade training




- Vital running track survey team mbr; measured/re-certified indoor/outdoor tracks--accomplished Wg CC top priority
- Vital to CES relocation of 25 psnl; transfered 142 tons/$1.5M assets/37K drawings--awarded CES/CC trophy

- Wg EOC rep; prepped base for natl emerg/dev'd/executed 16 plans--safeguarded wg prsnl/fortified global deterrence



Star Line

Bullet statements may be contributed using this form.