eprbulletsafsc.com

AFSC 6C0X1, Contracting EPR Bullets


- #1 of 16 troops...Recognized as "AMN of the Qtr" for OO-ALC/PKO's 2nd Qtr--dedication is second to none
- $8.6M PDM SS mbr; authored multiple planning WCD's--ens'd five acft spt & Hill's Maint Depot rpr's 100%
- 14 mbr tm/AF's only combt spt Wg; amp'd 37 workcenters/resolv'd 17 msn stoppages--spt'd QoL f/8K jt mbrs/4 cmds




- Aced Defense Language Proficiency Test for Chinese, attained AF linguistic proficiency level--inc'd AF assets
- Aced intense CON170 Cost/Price Analysis course--DAU states avg grad saves AF $600k+ throughout a career
- Administered Cope Retreat contract--improved family morale--crucial to maintain Air Force family structure
- Advanced Contract Mgt CCAF deg; dominated 7-level upgrade/ 1 undergrad crs--logged 3 credit hrs/4.0 GPA

- Air Show point-man; contracted 14 aerial demonstrations/$100K--showcased AF capabilities for 75K visitors
- Authored $9Mil Acquisition Plan for Roofing kt; chosen ahead of peers to draft--zero gap in CEG roof support
- Authored A & E continuity book; provided guidance to five new buyers--enhanced branch capabilities by 30%
- Averted Hill HAZMAT supply shortage; awd kt w/n 12 hrs/items rcvd w/n 72 hrs--Hill AFI/OSHA compliant

- Awarded $1.25M in feeder/AC unit contracts--enhanced climate controls/electrical systems for two squadrons
- Awarded $249K in MWR projects; new bus shelters/renovated softball dugouts--QoL impvd for 9K personnel
- Awarded $52K RASS kt--provided reliability--ensured untinterrupted aircraft flying in support of US interests
- Awarded 4 quick-turn contracts/11 option mods; resolved exp'd-use GPC prog error--guarante'd execution of >$2.5M

- Awarded 5 F22/F35 facility kts valued at $1.6M; constructed labs/secure rms/fuel bays for msn critical aircraft
- Awarded 8 HVAC systems valued at $1.8M; replaced deteriorating/broken systems--negotiated, saved $597K
- Awarded airfield surveillance cameras maint plan; boosted AT/FP conditions/$792M in base resources secure
- Awarded five F22/F35 facility kts valued at $1.6M; enabled depot expansion support for msn critical airframe

- Awarded medical lab testing kt for MDG, 5 yrs/$396K; results returned within 48 hrs; contributed fit-to-fight
- Awarded urgent lease kt; seven vehicles delivered on-time--facilitated $2.7M joint Army/AF classified testing
- Awarded vital $43K BPA; enabled $2M AF Research Lab payload test--received LOA from 388 Range Sq/CC
- Awd'd $13K design project; approved bldg construction added 4K sq ft/worth $700K--quick design svd $90K

- Awd'd $3.8M demo proj; consolidated CONS/LRS/SFS/DAPS ops--reduced wg's footprint/base energy usage
- Awd'd $88k design kt for OO-ALC HQ elevator; eliminated LHS issue--brought into compliance w/ ADA std
- Awd'd IPS Container/Qatar Embassy; secured 2,900 lbs of classified eqmt--averted leakage/encryption devices




- Backfilled 4 TDY/deployed tm mbrs; worked 30 additional hrs to overcome manning loss--service before self
- Benchmark NCO! Awd'd $40.2M construction/$14M commodities contracts--sq's 2d-largest yr in last decade
- Blew through CDC A set in <12 wks; scored 96%--#1 of 8 in UGT for PKO--on her way to AFSC five level!
- Bolstered HEDC COOP phase II; pvd'd mission critical IT server support--$4.6mil savings realized by AFMC

- Branch lead for 19 BPA's and 8 org's; simplified customer ordering process--product to end user 112% faster
- Brokered $96K med furniture contract; negotiated $17.3K savings--recouped funds for gp during govt fiscal constraints
- Built 7 Digital Imaging Shop test stands; increased workspace by 78%--supporting F-22 navigation/ops panels




- Certified in deployed operations; satisfied Contingency Contracting Officer qualifications--deployment ready
- Champion healthy lifestyle changes! Scored 95.4% on annual PFT--"Fit to Fight" example to 26 squadron Amn
- Changed APS-5 Qatar PWS; created flexibility for units; reduced mx down time for tactical equip from 45 days to 1
- Co-authored 64 pg SABER Guide; used to train CONS personnel--120 mnhrs saved/Id'd as ORI Wing strength

- Collected 1 ton of clothing for Ogden Rescue Mission Clothing Drive--ensured the less fortunate were clothed
- Completed 14 hrs of DAU independent study courses--broadened managerial understanding of military assets
- Completed 22 hours of DAU independent courses--inc'd kt technical capabilities--crushed group std's by 50%
- Completed 5 required DAU crs's; acquired contracting lvl 2 cert--upheld CSAF acquisition excellence priority

- Completed five of six CDC volumes & 37 OJT tasks; 4 months ahead of schedule for 5 lvl--deployment ready
- Completed Prgrm Mgt course; broadened skill set as contracting specialist--achieved second Lvl I APDP cert
- Conquered Contracting Officer exam; earned 100% on AF exam/given $1M warrant with only 2 yrs experience
- Coor'd Christmas dinner 3 remote FOB's; 600 meals flown via helicopter--ensured holiday meals for soldiers

- Cornerstone to Manas AB cost savings; expertly guided linguist contract--cut $881K/yr w/zero neg msn impact
- Created A&E guide book; trained five new buyers--enhanced branch knowledge of A&E contract buys by 30%
- Created two continuity presentations w/step-by-step photos--WAWF/EDA processes clearly outlined to flight!
- Crushed acq qual reqt; completed 3 acq crs for 132 CLPs; earned APDP Level II--finished in half allotted time

- Crushed acq qualification; sustained contracting credentials--attained 132 CLP's--finished in 1/2 alloted time




- Dedicated facility mgr; tackeld multiple bldg A/C issues--fixed 4 year heat problem/improved sq quality of life
- Dedicated to small business utilization; aided award of 711 kts--branch awarded Champion of Small Business
- Developed AFCAP kt oversight procedures theaterwide; led a team of 50 AFCAP CORs--ensured ktr accountability
- Developed AFSO21 Process Improvement/Project Efficiency plan; managed sq tms--improved inter-unit procedures

- Directed 152 inspections; 2.7K bldgs added to O&M schedule--housed 1.8K trps/733 safety deficiencies fixed
- Division CFC representative--raised over $1.7K in 1st week--exceeded goal expectations for various charities
- Dynamic NCO! Managed 22 mission critical kts worth >$37M w/only two yrs exp--1st class supt to 22K pers




- Eagerly completed CON 216/217/218, finished one class while deployed-- 9 mos ahead of schedule for Lvl II
- Embraced new C-130J msn; awd'd $800K FARP remodel & addition--secured forward aerial refueling equip
- Enforced North Afghan 1st counter insurgency prgm; increased Afghan work force by 243%--zero IED attacks
- Enforced RC-North Afghan 1st COIN prgm; increased Afghan labor force 243%--248 local families supported

- Established new cargo movement procedures; negotiated with Qatari customs--$114K frustrated cargo released
- Examined 53 completed contracts; closed/cleared out 37 PKOA backlog--averted UCI writeups/saved AF $3k
- Excelling in job requirements! Completed 36+ hrs of Performance Based Service Awds, CCO, & SBA training
- Exceptional AMN w/unmatched work ethic/drive; completed 4yr degree in ECON--enrolled in 2 MA classes!

- Executed $1.5M+ modifications extending services--prevented break for 13 kts for mission critical services
- Executed $1.6M repair project; prompted F-16 simulator install--assured highest readiness for 388 FW pilots
- Executed $190K Admin Sup't for 13 major systems; awarded in 5 vs 30 days--prevented critical msn shutdown
- Executed $25k 388 RANS support kt; UTTR missile targets pvd'd/short notice--2012 AF WSEP 100% success

- Executed $566K extension of incumbent OCMED services for inspection--key to the overall HSI "outstanding"
- Executed 3 emergency change orders for $375K; fixed 33 latrine/shower unit elect hzrds--ensured 3K trp safety
- Executed 3 urgent change orders for $375K; fixed 33 latrine/shower electrical hazards--ensured 3K trps safety
- Executed 771 WOs/$21M MRFs/372 LOTDs/11 PPRs/$3.6M COs; enabled msn critical service to warfighter

- Executed AF Recruiter booth rental kts within 4 dys vs a mo--recruitment up'd, received 6 leads/2 enlistments
- Exemplary PKO professional! Executed 43 actions worth $5M in supply/srvs kts w/less than 6 mos on the job
- Exercised 6 opts; provided continuity/3 cyber security/AtHoc/HEMP/turnstile mx--prevented lapse of vital spt
- Expanded Fairford Wi-fi network; resolved comm headache/saved $79K--boosted MWR f/ 963 amn/7 BTF rotations

- Expanded LRS warehouse for MOBAG consolidation; added 13K sq ft at $1.7M--facilitated new C-130J rqmt
- Expediated Camp DFAC; opened 4 months ahead of schedule; increased capacity by 200%--enabled trp surge
- Expedited $267K portable light generators contract; secured force protection/safety for 3.5K pax--saved $23K
- Expedited BEARCAT engine rqmt; awd'd 9 days vs 60-day std--restored full msn capability for critical msl convoy asset

- Expedited decon system to protect crew/passengers from CBRNE exposure; rec'd 6 months early--saving lives
- Expertly executed 46 EOY projects valued at $7.4M; concurrently managed 44 open kts--zero productivity lost
- Expertly managed recovery act spending; saved $1.3M for add'l AFSPC missions--awd'd $7.4M/33 projects
- Expertly researched $600K furniture requirements; met w/10 vendors increased competition; saved over $63K




- Facilitated $1.4M AMXS project; constructed new HQ/demo'd existing--minimized 23 WG structure footprint
- Facilitated $89.3M RC-North LOGCAP expansion; supported 12.6K troop increase--built 1/expanded 4 FOBs
- Finished 87 CLP's <8 mo; 1yr 4 mos/47 CLP ahead of DoD standard--inc'd management knowledge/AF assets
- Fixed UK's lrgst logistics contract/$13M; resolved 4 catastrophic performance probs--solidified PCS f/14K at 21 sites

- Flawlessly managed $2M comm/network infrastructure BPA; executed $128K in calls--in compliance w/DODI




- Guided commissary cleaning acq/4 UK locs; collab'd w/DECA f/ short notice stds rewrite--$16M yearly savings intact
- Guided emerg dorm flood rqmt; instilled recovery efforts <6 hrs--quick-action limited damages to $41K vs $6M fac loss
- Guided road restorations; $9.2M/11thoroughfares overhauled--fulfilled traffic standards/disability compliance rqmt's
- Groomed 14 mbr f/success; 9 PD session/6 NCO rdy f/ unlimited board--tm won 6 Wg awds/4 cmd coin/2x Tm OTQ




- Hand picked by CONS CC for AF-level testing of DoD-wide contracting database--provided superior analysis
- Hard charger! Attended 142 hrs of professional development crs--exceeded SAF standard rqmts by 102 points
- Headed HAF initiative; led AFWERX project/disposed 2M HAZMAT units--redirect'd $546M to fund AF-lvl priorities
- Hit the ground running! Brand new to the career field, executed $1.2M within 2 months w/minimum assistance




- ID'd/resolved six-month overdue funds register error--ensured continued ops of Cyber Cafe for 720 dorm Amn
- Id'ed imminent msn critical AUAB power pro kt issue; swiftly resolved; prevented msn stoppage at largest AOR wg
- Innovative thinker! Created preapproved stock lists; cut work order processing time by 75% & open orders by 80%
- Instituted AFMC Best Practice PR chase; tracked 370 EOY actions--ensured obligation of 88 4Q/FY11 awards

- Instructed CCO courses; blanket purchase agreements/agency procedures--deployed four airmen to support war
- Intercepted illicit buy of IT parts; guided customers to mandatory sources--ensured base-wide network security
- Interim Supt; mentored 33 mbrs/exec'd $7.6M portfolio/28 rqmts--hand-selected SME for HQ contracting SOP re-write
- Invaluable Jt Info Spt Task Force mbr; established customer trng for jt deployment--improved contracting prep




- Key contributor to reach 100% obligation EOY funds; successfully awarded 19 kts worth in excess of $800K
- Key contributor to reaching PKOA $17M obligation for EOY funds; successfully awarded 16 kts worth $1.2M




- Leadership understudy; read two books from CSAF suggested reading list--enhanced management awareness
- Leads PKOB's three chemical analysis kt's; provides immediate lab support for CEG--safe water for Hill AFB
- Led $2.1M incinerator/recycling proj enhancing QoL; eliminated burn pits; met EPA std & reduced waste 85%
- Led $4+M Waste Water Treatment Facility effort; retrofitted bldg to federal standards--safeguarded 5.5K prsnl

- Led $64k security door/grill kt for LRS, safe-guarded $3mil in LRS assets/tools--averted possible safety issue
- Led $85k CTCS Wolfe Air kt; pvd'd 6hrs of video for AF level films--first VPOTUS/AF2 film known to exist
- Led Moody's 2d-largest design yr; awd'd construction plans worth $115M--base rdy for FY13 facility funding
- Led Simplified Base Engineering tm; oversaw 2 mbrs/25 task orders/$3.7M--facilitated CAFB repairs/QoL projects

- Led the way! Cemented $2.4M contract for streets/parking lot repair--$3.5M paving IDIQ rdy for future rqmt's
- Led trng on legal authorities; boosted efficiency/applied real-world experiences--PK members deplymnt ready
- Led unit AFAF program; 100% employees contacted/two wks--raised $2010; exceeded division goal by 56%
- Life Saver! Identified roof design deficiency; obtained prior yr funds to execute change; lauded by 388 OG/CC




- Managed $12M Occupational Medicine Clinic; supplements govt pers--supports 18K fed/military in industry
- Managed $300K HC-130 fuel barn proj; upgraded foam suppression sys--elim'd ID'd HQ ACC/A7 deficiency
- Managed $340K north parking lot reconfiguration; removed traffic hazard--added 100 additional parking slots
- Managed 105 contracts/$7.1M during joint deployment; tackled AOR-wide issues--CENTCOM msn undeterred

- Managed 21 medical contracts at $25M; supplemented govt pers/expanded staffing--bolstered service f/500K patients
- Managed 22 extremely active medical services contracts, resulting in a very well run medical facility
- Managed 6 electrical projects; $2.7M to infrastructure modernization--decreased wg outages/enabled continuous msn
- Managed A&E IDIQ contract; issued six task orders valued at $205K--key to AFMC Operational Branch of Yr

- Managed OO-ALC/PK UDM Program; updated/corrected 27 folder errors--ensured PK military combat ready
- Managed SABER team of nine; 204 contract actions for $16M--PAFB/CMAFS repairs/QoL projects on sched
- Managed workload for 3 buyers/12 CE PMs; executed 46 EOY projects valued >$7.4M--zero productivity lost
- Masterfully modified $2.2M electrical contract; upgraded base infrastructure--a 30% increase in power output

- Meticulously administered WDD kt--enabled software integration--vital to weapons system trng for 508 ASW
- Mg'd Bahrain contract spt; delivered $245K SCIF rewire--established Jt Spec-Ops Task Force Gulf COMSEC
- Mitigated UTTR gravel hauling delays; redirected ktr efforts through firm negotiations--averted work stoppage




- NATO/ISAF OEF Deployment; $9B LOGCAP contract admin--life support for 5 FOBs/4 nation military forces
- NATO/ISAF OEF Deployment; $9B LOGCAP contract administrator; lifeline to 4 coalition forces for 5 FOBs




- Organized AFTI Bare Base trng class; exceeded CCO trng reqmt's--vital support/info for 15 CCO warfighters
- Outfitted seven classrooms for 192 ALS Amn; prepared 800 student guides & OI updates--graduates msn ready
- Outstanding contracting professional; finished 15 contract actions worth $1.4M w/only six months experience
- Outstanding! Managed 22 critical kts worth >$37M with only two yrs exp--supported 22K personnel--promote!

- Oversaw $3.5M CE simplified construction contract; 21 delivery orders--directly improved 25 base facilities
- Oversaw 4 HAZMAT storage container kt's; provided 300+ containers--guaranteed 100% AFI/kt compliance
- Oversaw stand up of 4 alt CAT locs; drove 9 tech upgrades/$40K--amp'd Wg C2/Battle Staff response cape by 300%




- Partnered w/psyops spec-ops; prepped 5 foreign tv/internet broadcast msn's--countered ISIS recruitment goals
- Penned 4 construction agreements worth $16M; slashed awd time by 120 days--rocketted start date milestones
- Performed 100% inspection of all COR records; ensured kt quality documentation complete & accurate--audit ready
- Phenomenal medical supt; contracting officer authority/$1M; CO for 4 buyers; led 36 contracts worth $50M+

- Piloted $10M fuels lab awd for South Afghan--enabl'd combat air ops at 7 FOBs in AORs most volatile region
- Piloted $3k ventilation mod; completed base car wash repairs 9 days early--QoL enhanced for 200+ users/mo
- Piloted 1st Camp Spann volleyball tournament; 100 participants--boosted esprit de corps with coalition forces
- Pilots $1M Vehicle spt kt; hvy equip kt leadtime for UTTR reduc'd 40%--integral cog for 388th wpn test coord

- Pioneered $1.8M boiler replacement requirement--restored energy compliance/conservation to MAJCOM goal
- Postured #1 AFMC Straddle Bid project; executed AFMC SRMC directive--readied contract for FY12 award
- Postured #1 priority Straddle Bid project; realized AFMC sustain/restore directive--prep'd, ready for award
- Praised by PKO/CC; executed extension in hrs vs dys to continue HazMat srvs; DOD remains EPA compliant

- Proactive contract performance evaluation expert; trained 37 Amn on procedures--reduced late reports by 33%
- Procured hardened living quarters; 12 Spec Ops members housed--boosted Military Info Spt Team-Lebanon spt
- Pumped $9M into strategic Iraqi First Program--instrumental in boosting economy, job skills, safety, and hope
- Pursuing Air Command and Staff College & APDP level III contracting certification; huge assett to OO-ALC




- QoL focused $2.1M incinerator/recycling project; abolished burn pits--brought to EPA std/reduced waste 85%




- Remodeled Airfield Tower; project greatly improved visability for air traffic controllers; 520 sorties secured
- Removed airfield lead paint; now EPA approved paint markings up to reflective specs--ensured safe landings
- Replaced steam lines in munitions area; ensured munitions kept at proper temp--$1.1M project, saved $140K
- Rescued OCMED project--ensured seamless transition w/contractor and Govt; on schedule with new contract

- Resolved $750K congressional inquiry; syncd 3 jt agencies/erased BTF deficiency--fueled 1st POTUS visit in 2 years
- Resolved 364 halted temp furniture deliveries; synced 5 multi-national orgs/est'd COAs--erased QoL nightmare f/720
- Resolved ADA & Life Safety Code violations; awarded OO-ALC/CC bldg replacement of handicap elevator
- Revamped PEM & AFDP for $136M QBOSS kt; created standardized formats; ensured compliance w/ FAR & SOP

- Revised SABER requirement tracker; status visibility available to CE--coordination reduced awd time 30%
- Reviewed & approved 400+ PR packets for accuracy, necessity & best value; guaranteed good stewardship of $2M
- Revitalized Youth Center! Led $6.8M renovation project; added & remodeled 33K sq ft--improved kids QoL
- Rushed $7.34k CEG storm-damaged trailer kt; 5 days from PR to delivery--minimal loss to CER response msn




- Secured ntwk masking svc; coord'd overseas rqmt/completed <2 weeks--enabled covert ops for 3 regional tms
- Selfless! Devoted over 70hrs to Black Dog Rescue/Humane Society; instrumental in 36 successful adoptions
- Selflessly aided low-income SDV; volunteered w/ Habitat for Humanity--provided 8 hrs/$1k in home repairs
- Setup mission critical support <2 dys; rushed $78k vehicle rental for 388RANS--enabled DoD lvl test success

- Showed unparalleled partnership w/CES; fostered wg spt/engineering excellence--'12 Curtin Award recipient
- Skillfully managed 22 contracts exceeding $1.6M value; supports 13 units/22K personnel--zero mission delay
- Smashed Wg/CC's #1 QoL pri; orchestrated no-cost housing fiber upgrade; 1st in 10 yrs--earned Wg's Innovator OTY
- Spearheaded $560K Xeriscaping project; solidified North/West Gates Force Protection--$55K under estimate!

- Spearheaded Command and Control for post attack reconnaissance/ATSO training--vital to 75 ABW ORI prep
- Spearheaded ISSP kt--ensured technical support for foreign F-16 flying program--allies trained in 29 countries
- Spearheaded three bridge IDIQ kts worth $12M; ensured cont'd SABER/CE mission--100% project obligation
- Spt'd 21 rqmts/$18M; enabled 2 CO's/181 actions/$63M/78 projs/$210M--ISO DLA $616M CONUS fuel fac mx prgm

- SS Team mbr for $4M TO data kt; spt's process of TO draft to AF pub--ensures current TO's distro'd AF wide
- Steered $1.3M Melrose Range/Chavez housing AT/FP upgrade; bolstered defense--secured 1K pers/SecDef initiative
- Stood up Qatar regional mgmt ofc; led mgmt transition of $260M in kts--retooled process to ensure DoD compliance
- Streamlined 3 HVAC requirements into single $400K award--upgraded dorm AC sys/90 day acquisition redux

- Streamlined PR process for QBOSS; refined approval process--reduced procurement time for critical parts by 75%
- Superstar! Led $40M SABER effort; 100+ projects/$8M executed for EoY--facilitated 100% of CES projects
- Supervised $24.9M roof repair/installs; refurbished 28 facilities--rectified storm damage/extended bldg lives 20-years
- Stood-up Wg's 1st-ever construction tm; crafted 65 projs/postured $62M MACC--garnered Grp's Innovation Tm OTQ




- Tackled 400 contract actions/$13M; enabler of 14 deployed bases/90K coalition forces/4K+ aircraft missions!
- Taking care of airmen; awarded $121K dorm furnishings; enhanced QoL for 60+ dorm residents--saved $131K
- Top 3 mentor at pers records rvw; ID'd 13 significant errors for 3 Amn--postured future career success for jr SFG mbrs
- Top notch! Completed 5-level three months early; Earned 35 AF CLP points to date--a year ahead of schedule

- Trained & led team of 90+ CORs! Led to issuance of 20+ CARs for ktr failures--critical to assure ktr accountability
- Trained Contingency BPA's; educated 10 CCO's on short notice--invaluable open forum--all deployment ready
- Trained Peers on correct closeout procedure; averted six major writeups--reduc'd PKOA's negative QDR 15%
- Triple duty with ease! Flight Chief, Contracting Officer, NCOIC; filled GS-12 billet--oversaw 13 proj/$1.7M

- Truly superb; earned 100% on AF CO exam/received $1M warrant with only 2 yrs experience--Promote Now!




- Urgently repaired $113K Well Six; ensured continuous water supply for flightline; executed in 12 vs 25 days




- Wg's #1 COVID volunteers; 6 prsnl/80 vol hours/4K jabs/lauded by MDS/CC--keyed AF's #1 vaccine utilization rate
- Vital to MTF operations! Led $10M med supt buy--expanded staffing/deployment compensated; custmer elated



Star Line

Examples can be contributed using this form.